Satellite imagery used to illustrate early site screening
Location intelligence. Before you commit.
DATA CENTER LOCATION RESEARCH

See the land.Find the possibility.

Power. Connectivity. Land. Risk. Bring every signal into focus—and find the data centre sites worth your next move.

NL–047 / AMERSFOORT EAST
Power intelligence120 MW

Potential capacity identified

PASS Illustrative example
Scroll to uncover the opportunity52.2461° N   5.4322° E ILLUSTRATIVE SITE

Available land is not the same as a viable site.

A parcel can look promising and still fail on power, fibre, water, access, planning or environmental constraints. DCLR brings those early signals together before detailed due diligence begins.

THE COSTLY QUESTIONWhat could rule this site out later?
Satellite view showing infrastructure constraints around industrial land
Grid capacity
Fibre diversity
Water exposure
Site access

Less guesswork.
More ground truth.

A brief becomes a map. A map becomes a shortlist.
Explore how DCLR connects the dots.

DCLRNetherlands / Initial screening Interactive example
01 / 04

Your requirements. Your starting point.

Move the power threshold. See how the same sites respond to a different brief.

Illustrative satellite map with three fictional screening candidates
NL / THREE CANDIDATES Illustrative map
NL–047 · 42 HA

Amersfoort East

Review
120 MW3 fibre routes

Validate water pathway and planning capacity.

Select a site to reveal its signals
8 signal domains. One consistent basis for a decision.
DCLR screeningTargeted due diligenceInvestment decision

Start deeper technical, legal and commercial work with the right candidates—and the questions that need answers.

Every signal matters. See what’s beneath the surface.

DCLR tests the infrastructure, land and risk conditions that can qualify, delay or rule out a site—then shows which result needs attention next.

01 / 08
Illustrative landscape used to explore the eight site screening domains
NL–047 / ILLUSTRATIVE SIGNAL LAYER
01 / POWERPass

120 MW

potential capacity identified
THE REQUIREMENT

A credible path to at least 100 MW.

THE SIGNAL

Grid infrastructure sits 1.8 km from the site. Indicative capacity clears the example threshold.

WHAT TO VALIDATE NEXT

Confirm available capacity, connection cost and delivery dates with the grid operator.

3 example sources · Q2 2026

What’s your
starting point?

An entire market or one promising parcel.
Bring what you know. We’ll help you see what’s next.

Each option opens an email draft with a few details to help us get started.

FROM ONE BRIEF TO A REUSABLE MODEL

Start focused. Build on what you learn.

We configure the criteria around your first brief, review the results together and keep the model ready for your next opportunity.

See the assessment

A clear result. The evidence behind it.

Every result shows what meets the requirement, what does not, what remains unknown and what should be validated next. Sources, dates and assumptions stay connected to each finding.

DD0 / FIRST ASSESSMENTIllustrative example
NL–047 · NETHERLANDS

Amersfoort East

42 ha · up to 120 MW

Further validation required

Signals worth pursuing

Grid proximity 1.8 km — within connection threshold

Three diverse fibre routes confirmed

Low flooding and seismic exposure

Clear land boundary, 42 ha available

Questions to take forward

Water pathway requires validation at DD1

Planning capacity under municipal review

Diverse power routing limited to two corridors

Amersfoort East presents a strong infrastructure profile with excellent grid proximity and fibre diversity. Water pathway and planning capacity are the two domains flagged for validation before proceeding to DD1.

Walk through a screening with us
Decision signalPromising power and connectivity profile. Validate water pathway and planning capacity.

Good decisions start with good questions.

Clear answers to the questions that matter before you commit time or capital.

Does DCLR replace due diligence?

No. DCLR is an early screening and qualification layer. It helps decide which sites merit further technical, legal and commercial due diligence and what that work should investigate first.

What can be screened?

A whole area, a defined set of candidate parcels or a single offered site.

Can the minimum requirements be configured?

Yes. Criteria, thresholds and priorities can be shaped around the market, capacity need, project brief and risk appetite.

What happens when the evidence is incomplete?

DCLR marks the result as unknown or requiring validation. Missing evidence should never be treated as a pass.

Can internal or client data be included?

Yes, where supplied data is compatible with the screening model. Its source and date should remain visible in the result.

Satellite view of land with data centre development potential

Your next opportunity is out there. Let’s find it.

We will configure the minimum requirements around a live opportunity and walk through the passes, blockers, unknowns, evidence and next validation actions.

Request a private screening

DCLR supports professional judgement and further due diligence; it does not replace them.